HEATED FLOOR + SCHLUTER SHOWER REMODELS
Warm floors. Watertight showers.
A bathroom remodel with a Schluter shower system and a DITRA-HEAT radiant floor, planned together from the start.
Prefer to talk? 916-847-2825

TRUSTED BY HOMEOWNERS
5-Star Rated.
Licensed · 15+ years experience
01
Heated Floors & Schluter Showers, Planned Together
If you’re redoing your shower, it’s the best time to add a heated floor. The old tile is already coming up, the subfloor is exposed, and both systems can be planned as one assembly. Versa Tile installs Schluter waterproof showers and Schluter DITRA-HEAT heated floors together, so your bathroom is warm underfoot and built to keep water where it belongs.
02
Why Do Both at Once
One demo, one prep, one tile install. You don’t pay to open the floor twice. The shower and floor systems are planned together, so transitions, heights and drains line up. Heat goes where you actually stand: in front of the vanity, the toilet and the shower entry, and even inside the shower. Tile is coordinated across the floor and shower for a finished, built-in look.


03
What’s Included
Schluter Waterproof Shower
A complete Schluter shower system: KERDI waterproofing membrane, KERDI-BOARD where needed, a sloped shower base and a drain, including KERDI-LINE linear drains for curbless designs. Explore Schluter shower installation.
Schluter DITRA-HEAT Heated Floor
A thin heating membrane installed under the tile, with a programmable thermostat so the floor is warm when you wake up. Explore heated bathroom floor installation.
Heated Shower Floor or Bench (optional)
Schluter allows DITRA-HEAT on shower floors and on the top of shower benches, with KERDI waterproofing installed over it. Read our heated shower floor and bench guide.
Tile Installation
Porcelain, ceramic or natural stone, including large-format and mosaic tile, installed to the system’s requirements.
Electrical and Permits
Heated floors need a thermostat and power. Your estimate spells out how the electrical connection will be handled and whether your city requires a permit. Plumbing and electrical work is handled by appropriately licensed trades.
04
How It Works
1. Free estimate: we look at your bathroom, talk through layout and tile, and map where heat makes sense.
2. Demo and prep: old tile and the shower come out, and the subfloor and walls are prepared.
3. Waterproofing and heat: the Schluter shower system and DITRA-HEAT membrane go in, and the heating cables are tested.
4. Tile: floor and shower tile are set and grouted.
5. Final check: the heat is tested again, and we walk you through the thermostat.
05
Examples of Our Shower Tile Work
Explore two examples of our walk-in shower tile work in the gallery photos below.
06
What Does It Cost?
Cost depends on bathroom size, how much of the floor you heat, shower size and design, tile choice, and how much prep the floor and walls need. Doing both at once usually costs less than doing them as separate projects, because demo and prep happen once. See our cost guides for Sacramento and the Bay Area, or request a free estimate for an exact number.
07
Frequently Asked Questions
08
Ready for a Warmer Bathroom?
Call or text Mike at (916) 847-2825, or request a free estimate using the form below.


